KapaMan capacity management KapaMan – Features and benefits

KapaMan capacity management

Your contact

David Wustmann
David Wustmann Head of logistics products
+49 351 314423-500 Email

Flexible capacity planning with KapaMan

Well-thought-out capacity planning is essential for reliable, punctual order scheduling. Using KapaMan, employee requirements can be planned flexibly and adapted according to the order situation. The basis for this is a dynamic planning time matrix, which is tailored to the individual storage and process structures at the company. This is preceded by detailed customer process analyses. Taking the handling and route times into account, KapaMan automatically determines the necessary capacity requirements and advises of possible bottleneck situations in good time. In this way, unproductive downtime, overtime premiums or even order delays can be recognised early and possibly prevented.

KapaMan functions

Personnel planning

  • Staff-related planning based on qualification and absence data
  • Integrated operating materials management
  • Flexible adaptation of automatically generated planning proposals

 

Control centre function

  • Route-optimised processing order planning (picking)
  • Integrated order status tracking system, incl. key figure monitor

 

Sandbox

  • Examination of impact of interactive changes in the parallel test system

 

Key figure controlling

  • By means of comprehensive evaluations and reports

 

Flexible software framework and professional process consulting

  • Efficient adaptations according to customer wishes in the LOGSOL framework
  • Requirements analysis and process definition by experienced capacity planners
  • Agent-based optimisation approach

KapaMan Benefits

  • Support for shift planning thanks to automatically created planning proposals
  • Transparency due to visualisation of the current order situation (control room function)
  • Operating cost savings due to avoidance of over/undercapacities
  • Risk minimisation of order delays/improvement of delivery deadline loyalty
  • Time saving due to route-optimised processing order planning
  • Key figure controlling by means of comprehensive evaluations and reports
  • Examination of interactive changes in the sandbox (completely separate from operations)

KapaMan – the essence

Requirements determination based on work schedules as well as a route network for journey time determination

Support from LOGSOL in modelling real processes in work schedules

Using methods-time measurement (MTM) if necessary

Possibility of mapping single and multi-stage picking processes

Possibility of including role-dependent planning times.

Journey time calculation in the virtual route network on the basis of the real layout

Supply

Determination of capacity supply using the work calender, including non-working days and public holidays

 

Consideration of employee absences and available operating materials

 

Inclusion of freely configurable shift models of the individual employees

 

Inclusion of individual employee qualifications from the qualification matrix (optional)

Requirements

Determination of capacity requirements based on quantities from order data or forecast figures

 

Definition of the earliest start time and the latest completion time according to deadline specifications provided

 

Possibility of additional prioritisation in KapaMan directly (necessary input possible by entry, via upload or automatic data transmission)

Shift planning

Support in shift planning using automatically generated planning proposals, which take all relevant restrictions into account

 

Possibility of manual detailing of the (well-founded) planning basis

 

Export/print function for the generated shift planning

Control centre function and evaluations/reports

Consolidated visualisation of the processing status with permanent status tracking

 

Additional graphic evaluations in order to keep important key figures in mind in the long term