Development of a logistics space concept for a production plant for trains in the context of the changed vertical range of manufacture
Project process
Set up the logistical quantity structure/calculation for the target scenario
Determine requirements for the logistics concept
Define basic process and storage rules based on the optimization points
Dimensioning of the storage and process areas, as well as the staging zones, taking into account the space requirements, traffic route consideration
Tools & competencies
MS Excel
AutoCAD
visTable
MS PowerPoint
Project results
Coordinated logistics master plan for the plant including a tool for area extrapolation, a layout concept, truck access routes, internal transport routes, necessary construction measures as well as cost indication and roadmap for realization.
Find out more about this project in our news blog post!